Case Studies
Case Studies
Restoration
All Saints Church
Apethorpe Hall
Barnwell Priory
Bersham Church
Clare College
Cranmer's Tower, Lambeth Palace
Easton on the Hill
Ickworth House
Lime House, Rutland
Royal Military Acadamy Sandhurst
Southoe Church
St. George's Hall
St. Peter's Church, Deene
Stormont Castle
Swineshead Church
Syon House
The Church of St. Michael & All Angels
Wadenhoe Church
Willian Church
New Build
Project Overview
Client: PCC Of All Saints Church, Moulton
Location: Moulton, Lincolnshire
Architect: Marshall Sisson Architect, Huntingdon
Contractor: CEL
Value: £540,000
Programme: 9 Months
Materials: Sixty tons of sandcast lead sheet; three tons of stone and 30 cubic metres of oak.

PCC Of All Saints Church, Moulton
The repair work required 60 tons of sandcast lead sheet. The sheet was installed to modern LSA standards, in conjunction with the design requirements of Helen Weatheral of architects Marshall Sissons.
The specialist skills of both carpenters and stonemasons were required to repair the damage to the decorative stone buttresses and traditional oak beams. Their expertise ensured that, where possible, the original materials were conserved while restoring the church's structural safety.